亚洲一区二区成人精品-99久久久精品国产-极品美女被后入干出水视频-国产成人av在线你懂的

Location: Home >>Product >>Power Technology >>Cable fusion

Cable intermediate molded fusion joints

model number:DX-WPS100-MRJ

Online Inquiry+8618926454155


Product details

Demand Analysis

The main causes of power cable line failure: According to statistics, power cable line failure (70 ~ 80)% occurred in the cable accessories (joints and terminals), and the failure rate of the intermediate joints is higher. Including the joints and accessories body quality problems, installation defects, environmental (water, dust, etc.) impact, in the cold and hot weather extreme load operation, the joints localized heat, accessories to accelerate thermal aging and lead to insulation degradation, under certain conditions induced breakdown faults.


Working Principle

10KV-110KV cable mold injection joint technology (MRJ), is based on the principle of cross-linked polyethylene cable body structure, in the truncated


Cable site production, the use of cable raw materials, based on the structure of the continuation of the layer to restore the connection, the scene regeneration of a new cable. Molded-Reinforced Jointing (MRJ)


The technology melts and combines the cable body structure to form a shield body without stress cone and active interface with consistent essential characteristics. The main solution


Core technical problems.

(1) No microscopic air (gap) between the cable insulation and joint insulation, shielding layer, to restore the intrinsic insulation properties.


(2) MRJ and cable combined as equivalent electrical properties, and cable field strength distribution consistent, eliminating any renewable electrical stress


 structural factors.


(3) Identical and stable physical and chemical properties.


(4) Durable safety and reliability.



Third, the functional characteristics


1, conductor connection performance: conductor using exothermic welding technology, conductor isometric, low-resistance, high-strength, welding point never aging, withstand the fault current impact and long-term high-current operation, electrical connections


 Durable and reliable electrical connection. The ratio of tensile breaking force of the conductor welding place to the body is 91.2%, and the tensile strength of the conductor joint reaches more than 90% of the strength of its body.


2, electric field stress control: MRJ according to the original cable conductor shielding and outer shielding structure, specifications and the same material to restore the production of conductor shielding layer and insulation shielding layer, to realize the MRJ and the original cable to a continuous, equivalent matching cable electric field shielding body.


 Effectively match the cable electric field shielding body, so that the electric field distribution and electric field strength in the natural state, highlighting the MRJ electrical stability and operational reliability.


3、Insulation:Using the same XLPE as the cable insulation to recover, MRJ insulation and cable insulation without air gap interface fusion bonding, structurally forming a consistent whole with the cable without obvious joint characteristics.


 Insulation strength is consistent with the original cable, with higher electrical insulation and stable operation of the durability of performance.


4、Performance of mechanical strength: copper core fusion bonding, the repair of the cable can be bent, without worrying about the impact of cable dragging.


5, waterproof performance: field layered injection melt, inside and outside the semi-conductor, insulation body and the original cable seamless fusion bonding, no interface, good waterproof performance.


6, the construction environment: the ambient temperature and humidity requirements are not high (due to the mold core cavity has a high temperature control);.


7、Application scope: two cable connection length is insufficient, MRJ in the length of less than 20cm distance case, can increase the conductor using exothermic welding to renew the conductor, so as to achieve the production of a


 MRJ connector can complete the power supply, reducing the cost of cable investment.


8, the external dimensions: and cable diameter is approximately equal or equal to the diameter of the production, and can be made in the MRJ cable bends, overhead suspension of the special location, does not take up too much space for use.

*** Translated with www.DeepL.com/Translator (free version) ***


Contact us

Shenzhen Dinsee Smart Technology Co.,Ltd
Tel:0755-21612345?Mobile&Whatsapp:+8618926454155
Fax:0755-21612345Whatsapp:+8618926454155E-Mail:business@szdx.com
Address: Building 2,xiangyuer Industry Part,NO.8 Longsheng Road,Longgang District,Shenzhen 518126,China

The online monitoring, distributed fault location and cable online monitoring equipment for power transmission and distribution lines launched by SHENZHEN DINSEE SMART TECHNOLOGY CO.,LTD. has been widely used in Southern Power Grid and State Grid, and has achieved good results.

Record No.: Yue ICP Bei 2022070794-1 | Website Map XML Map

日韩欧美国产综合一区二区| 国产在线精品一区二区| 亚洲情精品中文字幕99在线| 午夜诱惑一区二区三区| 久久精品国产亚洲av品| 日本在线观看高清区一区二| 最新欧美精品一区二区| 又大又爽又黄少妇免费视频| 日韩一级成人性生活视频| 日本韩国精品视频在线| 亚洲国产精品一二三四五| 国产午夜福利精品一区二区三区 | 久久精品国产亚洲av高| 国产三级在线日本国产| 国产成人精品一区二区| 亚洲日本不卡在线一区二区| 国产精品人妻一码二码| 亚洲精品一区不卡在线观看| 久久亚洲精品日韩高清| 免费欧美大片在线观看高清| 亚洲精品免费福利视频| 日韩精品熟妻人女亚洲一区| 日本高清人妻一区二区| 尤物视频免费观看内地| 国产精品久久成人午夜一区二区| 人妻少妇一区二区三区四区| 日韩精品一区二区在| 亚洲欧美日韩精品一区二| 亚洲午夜91久久久精品影院| 亚洲国产精品熟女久久久| 婷婷丁香六月激情综合| 97碰碰视频在线观看| 精品国产自产在线观看| 亚洲综合国产激情一区二区| 蜜桃臀内射一区二区三区| 人妻少妇精品激情在线| 欧美日韩福利视频在线| 国产精品不卡一区二区红桃视频| 成人av毛片18岁免费看| 久久久精品人妻一区二区三区免费 | 人妻中文字幕一区av|